Home Theater Installation

kelsey
kelsey Posts: 7
edited August 2009 in Wanted (WTB) Classifieds
Hi everybody,

Recently I got a wonderful service provider for installation of our Home Theater, Plasma Television or LCD Television. They have specialization in the installation of IPTV, devices, LCD TV's, Surround Sound Systems and Plasma TV. They mount Plasma/LCD HDTV on wall, on ceiling, above fireplace, on brick or stone wall. For more information you my visit my signature link.

Hope this will help you.

Enjoy!
Post edited by kelsey on

Comments

  • apphd
    apphd Posts: 1,514
    edited July 2009
    Where is noahnoah with his aid in this spamming.

    Reported.
  • wutadumsn23
    wutadumsn23 Posts: 3,702
    edited July 2009
    lol, yeah those two seem to be working as a team.
    HT Rig
    Receiver- Onkyo TX-SR806
    Mains- Polk Audio Monitor 70
    Center- Polk Audio CS2
    Surrounds- Polk Audio TSi 500's :D
    Sub- Polk Audio PSW125
    Retired- Polk Audio Monitor 40's
    T.V.- 60" Sony SXRD KDS-60A2000 LCoS
    Blu-Ray- 80 GB PS3


    2 CH rig (in progress)
    Polk Audio Monitor 10A's :cool:

    It's not that I'm insensitive, I just don't care.. :D
  • Toxis
    Toxis Posts: 5,116
    edited July 2009
    he drops "buzz words" like he's talking to the general public to sound like he knows what he's talking about. But here, he just sounds like an idiot. lol Trunk slammers are funny.
    Never kick a fresh **** on a hot day.

    Home Setup: Sony VPL-VW85 Projo, 92" Stewart Firehawk, Pioneer Elite SC-65, PS3, RTi12 fronts, CSi5, FXi6 rears, RTi6 surround backs, RTi4 height, MFW-15 Subwoofer.

    Car Setup: OEM Radio, RF 360.2v2, Polk SR6500 quad amped off 4 Xtant 1.1 100w mono amps, Xtant 6.1 to run an eD 13av.2, all Stinger wiring and Raammat deadener.
  • Systems
    Systems Posts: 14,873
    edited July 2009
    I need my home theater istalled. However, I will need to see a copy of your Worker's Compensation, Liability Insurance and present standing with BBB and Dunn & Bradstreet. Before we sign a contract I'll need a lien release for the work performed. A security background check will be made available for ispection before further discussions of the scope of work is discussed. A proper proposal attached to your bid outlining the actual work to be performed or in other words a scope of work will be submitted at time of the bid submital. I accept most all forms of work scheduling outlined on current versions of the software of your choice. MSDS sheets of all materials used should be presented in a seperate binder and a HAZMAT policy will be required. After an agreement has been reached it should be known that a Delay In Completion clause will be in effect starting at 12:00:01am EST on the day of said completion. This penalty will remain in effect until all work is completed to my complete satisfaction to include all work outlined in the final punch list. This penalty will be in the amount of $250.00 a day and not to exceed the total amount of the original contracted price by no more than 250%. If the scope of work can not be completed due to any and all conditions to include complications due to acts of nature, man or beast discussed in the issue of my adendum to the contract payment for the completion of work is to be made by you in no more than 24 hours after the breach of contract in the form of payment of my choice.
    Testing
    Testing
    Testing
  • wutadumsn23
    wutadumsn23 Posts: 3,702
    edited July 2009
    187CAM wrote: »
    I need my home theater istalled. However, I will need to see a copy of your Worker's Compensation, Liability Insurance and present standing with BBB and Dunn & Bradstreet. Before we sign a contract I'll need a lien release for the work performed. A security background check will be made available for ispection before further discussions of the scope of work is discussed. A proper proposal attached to your bid outlining the actual work to be performed or in other words a scope of work will be submitted at time of the bid submital. I accept most all forms of work scheduling outlined on current versions of the software of your choice. MSDS sheets of all materials used should be presented in a seperate binder and a HAZMAT policy will be required. After an agreement has been reached it should be known that a Delay In Completion clause will be in effect starting at 12:00:01am EST on the day of said completion. This penalty will remain in effect until all work is completed to my complete satisfaction to include all work outlined in the final punch list. This penalty will be in the amount of $250.00 a day and not to exceed the total amount of the original contracted price by no more than 250%. If the scope of work can not be completed due to any and all conditions to include complications due to acts of nature, man or beast discussed in the issue of my adendum to the contract payment for the completion of work is to be made by you in no more than 24 hours after the breach of contract in the form of payment of my choice.

    LOL, very similar to the contract needed to date my Daughter, lol.
    HT Rig
    Receiver- Onkyo TX-SR806
    Mains- Polk Audio Monitor 70
    Center- Polk Audio CS2
    Surrounds- Polk Audio TSi 500's :D
    Sub- Polk Audio PSW125
    Retired- Polk Audio Monitor 40's
    T.V.- 60" Sony SXRD KDS-60A2000 LCoS
    Blu-Ray- 80 GB PS3


    2 CH rig (in progress)
    Polk Audio Monitor 10A's :cool:

    It's not that I'm insensitive, I just don't care.. :D
  • polkanddie
    polkanddie Posts: 224
    edited August 2009
    Whats funny is I had to sign one to date someones daughter before....
    TV- Insignia 46'' LED,1080p,120hz
    Monster Power center hts3600 mk2
    Onkyo tx sr 503
    Rm6600 with 4 sanus stands
    SUB(DIY)
    Dayton HPSA500, JVC Arsenal dvc 2ohm 12" wired to 4ohms in 1.5 cu ft sealed box
    extras... RT10's.rti4s.atrium 5's.

    "sticking feathers up your butt does not make you a chicken"-Tyler Durden
  • wutadumsn23
    wutadumsn23 Posts: 3,702
    edited August 2009
    LOL, Don't give me any ideas!! :D
    HT Rig
    Receiver- Onkyo TX-SR806
    Mains- Polk Audio Monitor 70
    Center- Polk Audio CS2
    Surrounds- Polk Audio TSi 500's :D
    Sub- Polk Audio PSW125
    Retired- Polk Audio Monitor 40's
    T.V.- 60" Sony SXRD KDS-60A2000 LCoS
    Blu-Ray- 80 GB PS3


    2 CH rig (in progress)
    Polk Audio Monitor 10A's :cool:

    It's not that I'm insensitive, I just don't care.. :D
  • mdk5068
    mdk5068 Posts: 204
    edited August 2009
    How old? : )









    jk..







    ...but seriously...


    LOL, very similar to the contract needed to date my Daughter, lol.
    Bulls make money.
    Bears make money.
    Pigs get slaughtered.
    ...
    You, my friend, are the bacon.
  • soiset
    soiset Posts: 724
    edited August 2009
    187CAM wrote: »
    I need my home theater istalled. However, I will need to see a copy of your Worker's Compensation, Liability Insurance and present standing with BBB and Dunn & Bradstreet. Before we sign a contract I'll need a lien release for the work performed. A security background check will be made available for ispection before further discussions of the scope of work is discussed. A proper proposal attached to your bid outlining the actual work to be performed or in other words a scope of work will be submitted at time of the bid submital. I accept most all forms of work scheduling outlined on current versions of the software of your choice. MSDS sheets of all materials used should be presented in a seperate binder and a HAZMAT policy will be required. After an agreement has been reached it should be known that a Delay In Completion clause will be in effect starting at 12:00:01am EST on the day of said completion. This penalty will remain in effect until all work is completed to my complete satisfaction to include all work outlined in the final punch list. This penalty will be in the amount of $250.00 a day and not to exceed the total amount of the original contracted price by no more than 250%. If the scope of work can not be completed due to any and all conditions to include complications due to acts of nature, man or beast discussed in the issue of my adendum to the contract payment for the completion of work is to be made by you in no more than 24 hours after the breach of contract in the form of payment of my choice.


    What, no Environmental Impact Statement? You're easy.